Skip to content

base upgrade tests on agoric-3-proposals #27441

base upgrade tests on agoric-3-proposals

base upgrade tests on agoric-3-proposals #27441

Triggered via pull request November 4, 2023 16:09
Status Failure
Total duration 1h 2m 4s
Artifacts 1

integration.yml

on: pull_request
pre_check  /  Check preconditions and cancel previous jobs
6s
pre_check / Check preconditions and cancel previous jobs
Matrix: getting-started
Matrix: test-docker-build
set-integration-result-in-progress
8s
set-integration-result-in-progress
finalize-integration-result
5s
finalize-integration-result
Fit to window
Zoom out
Zoom in

Annotations

4 errors
test-docker-build (test)
The job running on runner GitHub Actions 17 has exceeded the maximum execution time of 60 minutes.
test-docker-build (test)
The operation was canceled.
test-docker-build (main)
The job running on runner GitHub Actions 16 has exceeded the maximum execution time of 60 minutes.
test-docker-build (main)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
deployment-test-results-20231104T165215 Expired
420 MB