base upgrade tests on agoric-3-proposals #27441
integration.yml
on: pull_request
pre_check
/
Check preconditions and cancel previous jobs
6s
Matrix: getting-started
Matrix: test-docker-build
set-integration-result-in-progress
8s
finalize-integration-result
5s
Annotations
4 errors
test-docker-build (test)
The job running on runner GitHub Actions 17 has exceeded the maximum execution time of 60 minutes.
|
test-docker-build (test)
The operation was canceled.
|
test-docker-build (main)
The job running on runner GitHub Actions 16 has exceeded the maximum execution time of 60 minutes.
|
test-docker-build (main)
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
deployment-test-results-20231104T165215
Expired
|
420 MB |
|