Skip to content

base upgrade tests on agoric-3-proposals #27439

base upgrade tests on agoric-3-proposals

base upgrade tests on agoric-3-proposals #27439

Triggered via pull request November 4, 2023 15:16
@turadgturadg
converted_to_draft #8476
8443-drop-upgrade-tests
Status Cancelled
Total duration 32m 48s
Artifacts 1

integration.yml

on: pull_request
pre_check  /  Check preconditions and cancel previous jobs
5s
pre_check / Check preconditions and cancel previous jobs
Matrix: getting-started
Matrix: test-docker-build
set-integration-result-in-progress
5s
set-integration-result-in-progress
finalize-integration-result
0s
finalize-integration-result
Fit to window
Zoom out
Zoom in

Annotations

4 errors
test-docker-build (test)
Canceling since a higher priority waiting request for 'Integration tests-refs/pull/8476/merge' exists
test-docker-build (test)
The operation was canceled.
test-docker-build (main)
Canceling since a higher priority waiting request for 'Integration tests-refs/pull/8476/merge' exists
test-docker-build (main)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
deployment-test-results-20231104T154636 Expired
418 MB