Skip to content

test: fusdc multichain #38696

test: fusdc multichain

test: fusdc multichain #38696

Triggered via pull request December 10, 2024 23:23
Status Cancelled
Total duration 10m 15s
Billable time 4m
Artifacts 3

integration.yml

on: pull_request
pre_check  /  Check preconditions and cancel previous jobs
4s
pre_check / Check preconditions and cancel previous jobs
Matrix: getting-started
deployment-test
9m 14s
deployment-test
test-docker-build
9m 0s
test-docker-build
test-multichain-e2e  /  ...  /  multichain-e2e
43s
test-multichain-e2e / Multichain E2E (Orchestration API) / multichain-e2e
test-multichain-e2e  /  ...  /  multichain-e2e
2m 42s
test-multichain-e2e / Multichain E2E (Fast USDC) / multichain-e2e
finalize-integration-result
0s
finalize-integration-result
Fit to window
Zoom out
Zoom in

Annotations

16 errors and 1 warning
test-multichain-e2e / Multichain E2E (Fast USDC) / multichain-e2e
Argument of type 'typeof import("node:child_process")' is not assignable to parameter of type '{ execFileSync: ExecSync; log: (...args: unknown[]) => void; }'.
test-multichain-e2e / Multichain E2E (Fast USDC) / multichain-e2e
Process completed with exit code 2.
test-multichain-e2e / Multichain E2E (Orchestration API) / multichain-e2e
Argument of type 'typeof import("node:child_process")' is not assignable to parameter of type '{ execFileSync: ExecSync; log: (...args: unknown[]) => void; }'.
test-multichain-e2e / Multichain E2E (Orchestration API) / multichain-e2e
Process completed with exit code 2.
getting-started (registry/yarn)
Canceling since a higher priority waiting request for 'Integration tests-refs/pull/10618/merge' exists
getting-started (registry/yarn)
The operation was canceled.
getting-started (registry/npm)
Canceling since a higher priority waiting request for 'Integration tests-refs/pull/10618/merge' exists
getting-started (registry/npm)
The operation was canceled.
getting-started (link-cli/yarn)
Canceling since a higher priority waiting request for 'Integration tests-refs/pull/10618/merge' exists
getting-started (link-cli/yarn)
The operation was canceled.
getting-started (registry/npx)
Canceling since a higher priority waiting request for 'Integration tests-refs/pull/10618/merge' exists
getting-started (registry/npx)
The operation was canceled.
test-docker-build
Canceling since a higher priority waiting request for 'Integration tests-refs/pull/10618/merge' exists
test-docker-build
The operation was canceled.
deployment-test
Canceling since a higher priority waiting request for 'Integration tests-refs/pull/10618/merge' exists
deployment-test
The operation was canceled.
pre_check / Check preconditions and cancel previous jobs
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636

Artifacts

Produced during runtime
Name Size
deployment-test-results-20241210T233334
36.5 MB
multichain-e2e-logs-agoric-multichain-testing-12266494490-multichain-e2e
2.4 KB
multichain-e2e-logs-agoric-multichain-testing-fusdc-12266494490-multichain-e2e
2.41 KB