Skip to content

FU oracle operator CLI #38191

FU oracle operator CLI

FU oracle operator CLI #38191

Triggered via pull request November 26, 2024 18:12
Status Cancelled
Total duration 1m 34s
Billable time 4m
Artifacts

integration.yml

on: pull_request
pre_check  /  Check preconditions and cancel previous jobs
5s
pre_check / Check preconditions and cancel previous jobs
Matrix: getting-started
deployment-test
1m 8s
deployment-test
test-docker-build
1m 7s
test-docker-build
test-multichain-e2e  /  ...  /  multichain-e2e
1m 2s
test-multichain-e2e / Multichain E2E (Orchestration API) / multichain-e2e
test-multichain-e2e  /  ...  /  multichain-e2e
1m 10s
test-multichain-e2e / Multichain E2E (Fast USDC) / multichain-e2e
finalize-integration-result
0s
finalize-integration-result
Fit to window
Zoom out
Zoom in

Annotations

13 errors and 1 warning
getting-started (registry/npm)
Canceling since a higher priority waiting request for 'Integration tests-refs/pull/10570/merge' exists
test-multichain-e2e / Multichain E2E (Orchestration API) / multichain-e2e
Canceling since a higher priority waiting request for 'Integration tests-refs/pull/10570/merge' exists
test-multichain-e2e / Multichain E2E (Orchestration API) / multichain-e2e
Input required and not supplied: path
getting-started (registry/npx)
Canceling since a higher priority waiting request for 'Integration tests-refs/pull/10570/merge' exists
getting-started (link-cli/yarn)
Canceling since a higher priority waiting request for 'Integration tests-refs/pull/10570/merge' exists
test-multichain-e2e / Multichain E2E (Fast USDC) / multichain-e2e
Canceling since a higher priority waiting request for 'Integration tests-refs/pull/10570/merge' exists
test-multichain-e2e / Multichain E2E (Fast USDC) / multichain-e2e
Input required and not supplied: path
test-docker-build
Canceling since a higher priority waiting request for 'Integration tests-refs/pull/10570/merge' exists
test-docker-build
The operation was canceled.
getting-started (registry/yarn)
Canceling since a higher priority waiting request for 'Integration tests-refs/pull/10570/merge' exists
deployment-test
Canceling since a higher priority waiting request for 'Integration tests-refs/pull/10570/merge' exists
deployment-test
An error occurred trying to start process '/usr/bin/bash' with working directory '/home/runner/work/agoric-sdk/agoric-sdk/./networks'. No such file or directory
deployment-test
The operation was canceled.
deployment-test
No files were found with the provided path: ./networks/chaintest/results. No artifacts will be uploaded.