Skip to content

chore: repair upgrade 18 proposal #36842

chore: repair upgrade 18 proposal

chore: repair upgrade 18 proposal #36842

Triggered via pull request October 29, 2024 19:58
Status Cancelled
Total duration 20m 52s
Billable time 21m
Artifacts 1

integration.yml

on: pull_request
pre_check  /  Check preconditions and cancel previous jobs
5s
pre_check / Check preconditions and cancel previous jobs
Matrix: getting-started
deployment-test
20m 31s
deployment-test
test-docker-build
20m 10s
test-docker-build
test-multichain-e2e  /  multichain-e2e
20m 16s
test-multichain-e2e / multichain-e2e
finalize-integration-result
0s
finalize-integration-result
Fit to window
Zoom out
Zoom in

Annotations

6 errors
test-docker-build
Canceling since a higher priority waiting request for 'Integration tests-refs/pull/10363/merge' exists
test-docker-build
The operation was canceled.
test-multichain-e2e / multichain-e2e
Canceling since a higher priority waiting request for 'Integration tests-refs/pull/10363/merge' exists
test-multichain-e2e / multichain-e2e
The operation was canceled.
deployment-test
Canceling since a higher priority waiting request for 'Integration tests-refs/pull/10363/merge' exists
deployment-test
The operation was canceled.

Artifacts

Produced during runtime
Name Size
deployment-test-results-20241029T201849
120 MB