Brief:
- Added suggestions to the survey designed by Kushan and designed the form.
- Mailed the academic committee for the survey forms and sent out a mass mail
- MOM all till 29 Feb. (8 MOM's)
- Revised the SRS version 1 on 18 Feb, Thursday
- Making charts and survey analysis for SRS
- Made the project plan sections 1,2,3,5
- SRS section 2.2, 2.1.1 2.1 created. 1.6 created
- SRS reviewed final version 1.
- SRS appendix added.
- SDLC contributed two sections
Brief: Worklog for 29 Feb and onwards
- Survey v2 helped design edit and review.
- Taught Deergha git and helped her set the system up.
None
- Collected survey of 40 people individually.
To be carried over
- Make the TODO app by friday (LEFT)
- Read about the TODO app and followed it to make one of my own.
None
- None
None
- Read about Agile development from the Software engineering book.
None
- Read about the different activity diagrams online from tutorials point
None
- Made the Cost estimation document using the COCOCO model
None
- None
None
- System test plan section 1,2,3,4,12,13 Created
None
- System Test plan Sections assigned to Kuljeet Reviewed.
None
- Added a document explaining how agility was incorporated and would be incorporated in the software development process for 3 months.
- Re-read the two documents systemtest plan and the SDLC for final verification before entering the testing phase.
- Read about travis CI and understood the working of travis
- Integrated travis CI for the project in our repository
- Helped Saloni with a writeup for Travis for the readme document for the git repo.
- Made the component icon.js file for the project for all the icons that the project would need.
- Made the testing document with few functionality test cases that would be tested.
- Worked on the TODO redcuers test cases in Chai Mocha.
- Worked on the INTRANET reducers test cases.
- Worked on the testing report for unit test cases that are written.
- Started working on the termination analysis report
- Worked on the termination analysis report
- Added more test cases to the document that we functionally tested.
- Completed the termination analysis.
- Added the section of functionality in the outline of testing that we performed.
- Helped to prepare the presentation slides
- Got the letter signed from Prof. Pillutla
- Added sections of the deployment plan