Skip to content

Latest commit

 

History

History
137 lines (91 loc) · 2.07 KB

Kushan.md

File metadata and controls

137 lines (91 loc) · 2.07 KB

Uptil 29th Feb

Brief: Contributed to the SRS, Project Plan, Project Proposal and survery.

1st March

  • Designing of survey.

2nd March

  • Survey analysis.

3rd March

  • Survey Analysis

4th March

  • Teaching the team about recommended git practices.

5th March

  • started working on project design

6th March

  • Gathering knowledge required to start work on project design

Work

A tick indicates a complete work

  1. Survey Analysis
  2. Project Design

8 March

Work

  • System Test Plan
  • Application Architecture Research

9 March

Work

  • Redux application architecture

Work left

None

10 March

Work

  • Finalize and incorporate SDLC in our development cycle.

19 March

Work

  • Begin creating base coding
  • Server side integration of intranet

20 March

  • Begin widgetbase code
  • Server code rendering of Intranet

21 March

  • Add bootstrap to code
  • Implement fuzzy search in server

22 March

  • Addition of login actions to redux code
  • Send intranet folders to front end

23 March

  • Travis-CI integration
  • Add showcreate todo actions

24 March

  • Implement Router for front end logic

25 March

  • Fixing error in reducer state

26 March

  • Add Icon componentjs

27 March

  • Add grid system to work

28 March

  • Mobile Scrolling fix

1st April

  • Create Home view

2nd April

  • Integrate mocha JS and testing with the main app.

3rd April

  • Create loading screen

4th April

  • Intranet module
  • firebase integration

5th April

Work

  • Worked on the TODO redcuers test cases in Chai Mocha.

5 April

  • revamp TODO ui

6th April

  • Sidebar logout

7 April

  • Merging all the codes of peer

8 April

  • Fixed UI bugs

9 April

  • Linting errors fix

10 April

  • Discussions for lecturers

11 April

  • Add intranet reducer tests

12 April

  • Way point

13 April

  • Final ui changes
  • testing interagtion
  • load testing

14 April

  • Final code review and testing
  • Documentation