Skip to content

Latest commit

 

History

History
130 lines (70 loc) · 1.67 KB

Deergha.md

File metadata and controls

130 lines (70 loc) · 1.67 KB

Deergha Worklog


##Till 29th Feb

  • Make Traceability Matrix Version 1

  • Survey analysis updated

  • Formatting of SRS

  • Took interview of MScIT student

  • Took survey of 30 students of any batch.

  • Took survey of 40 student of Btech first year batch.

Work left


  • Make TODO App

6th march

  • No work done

Deergha Worklog


##1st march

  • To makeTodo app

##2nd march

  • to make todo app

##3rd march

  • Took 45 survey from Btech 1st year student

4th march

  • To make survey document file

5th march

  • To make survey document file

Work left


  • Start react tutorial

7th march

  • to make LLD document

8th march

  • to make LLD document

9th march

  • Updated SRS

  • updated Low level document

18th to 27 march

  • Read all document

28th & 29th march

  • Help in to make login page

30th march

  • To make code of conduct document

31th march

  • Make directory in readme file

1st & 2nd April

  • To make Tools And Library document

3rd & 4th April

  • To make section 1 & 2 in RMMMP doc

5th and 6th april

  • To make remaning section of RMMMP doc

7th April

  • Make a folder consisting of photos of all the professors of DA and their name as visible on intranet

8th April

  • To make MoM for 8th April
  • Formating System Test Plan , Rmmmp doc

9th April

  • Nothing

10th April

  • Updated Tools and Library doc

11th April

  • Checked All documents and Formated

12th April

  • Checked All documents and Formated
  • Tools and Library Updated V3

13th April

  • Check and format all the documents.
  • Work on the test report document

14th April

  • review Termination Analysis
  • Make Coverage Report