Skip to content

RMA WG 03 15 2018

Min Si edited this page Mar 15, 2018 · 3 revisions

Agenda

  1. Collect opens, assign note taker
  2. Bob C. (Cray): Follow-up on Cray put with signal #206
  3. Nick (DoD): Follow-up on Wait-and-then-reset / SHMEM-IFTTT #208
  4. Dave O. (Intel): SHMEM Wait/test-all/some/any #207

Attendees

Manju, Ferrol, Thomas, Bob, Dave, Jim, Megan, Naveen, Min, Tony SBU, Wasi

Actions

  • Follow-up from 3/1: Get feedback/input from users on shmem_put_signal w.r.t. the type of the signal word (e.g., size_t, uint64_t, something else?) and the type of the signal operation (e.g., atomic write, atomic add).

Minutes

Clone this wiki locally