diff --git a/throughput_for_focused_light.tex b/throughput_for_focused_light.tex index dcf707e..e9ec0d2 100644 --- a/throughput_for_focused_light.tex +++ b/throughput_for_focused_light.tex @@ -1,11 +1,12 @@ \section{Throughput for Focused Light} \label{sec:throughout_for_focused_light} -The ComCam throughput has been estimated in ugriz using FGCM and is discussed in detail in Sec.~\ref{sec:photometric_calbration}. +The ComCam throughput has been estimated in ugriz using FGCM and is discussed in detail in Sec.~\ref{sec:photometric_calibration}. \subsection{Collimated Beam Projector Status} -The Collimated Beam Projector (CBP) and Ekspla tunable laser were both installed on the dome during the week of November 18. See Figs.~\ref{fig:cbp_1, fig:cbp_2, fig:laser} figThey will both be connected to ethernet and a laser interlock system will be installed. First photon from the CBP is projected for December 2. +The Collimated Beam Projector (CBP) and Ekspla tunable laser were both installed on the dome during the week +of November 18. See Figs.~\ref{fig:cbp_1}, \ref{fig:cbp_2}, \ref{fig:laser} They will both be connected to ethernet and a laser interlock system will be installed. First photon from the CBP is projected for December 2. \begin{figure}[htbp] \includegraphics[width=\textwidth]{throughput_for_focused_light_figures/cbp_on_dome_1.png}