Scheduled - upgrade #466
integration-on-schedule-upgrade.yml
on: schedule
Start integration test (upgrade)
/
Preprocess input variables
0s
Start integration test (upgrade)
/
Preprocess input variables for linode
9s
Matrix: Start integration test (upgrade) / Run integration test on linode cluster
Annotations
4 errors
Start integration test (upgrade) / Run integration test on linode cluster (1.31)
The job running on runner GitHub Actions 10 has exceeded the maximum execution time of 360 minutes.
|
Start integration test (upgrade) / Run integration test on linode cluster (1.31)
Process completed with exit code 1.
|
Start integration test (upgrade) / Run integration test on linode cluster (1.31)
Process completed with exit code 2.
|
Start integration test (upgrade) / Run integration test on linode cluster (1.31)
The operation was canceled.
|