-
If we want to move mice between rigs using IBLRIGv8, is there anything special we need to do (i.e. in version 7 we copied the previous days session data to the new rig)? |
Beta Was this translation helpful? Give feedback.
Replies: 1 comment
-
Hi @kimiline. Sorry for the late reply - I missed the notification and it got lost over the holidays. As long as the data has been transferred to the local server (cf. https://int-brain-lab.github.io/iblrig/usage.html#copy-commands) you can resume training from any of your rigs. You don't need to -- and shouldn't -- copy any data manually. The copy scripts run several checks assuring consistency of your data-transfers. I hope that answers your question. Cheers! |
Beta Was this translation helpful? Give feedback.
Hi @kimiline. Sorry for the late reply - I missed the notification and it got lost over the holidays.
As long as the data has been transferred to the local server (cf. https://int-brain-lab.github.io/iblrig/usage.html#copy-commands) you can resume training from any of your rigs. You don't need to -- and shouldn't -- copy any data manually. The copy scripts run several checks assuring consistency of your data-transfers.
I hope that answers your question. Cheers!