-
Notifications
You must be signed in to change notification settings - Fork 193
Release
If the branch contains back-portable changes you can perform a revision release changing the Z
in X.Y.Z
:
geoserver-manager-{major.minor.revision}.jar`
otherwise a minor or major release change is needed. Note that in this case (minor or major release) you have to create a new branch following the branch naming convention as following.
The snapshot release version will follow the branch naming convention.
For example if the stable branch name is 1.5.x
the development version will be 1.5-SNAPSHOT
.
The main development branch name will be master
(called trunk in SVN) and the resulting maven version will be 1.6-SNAPSHOT
.
For a more detailed discussion on the release process please ref to this page
To release a new version of geoserver manager you can use the mvn release plugin:
The following line will ask you for the new release version:
mvn release:prepare release:perform -Dall -Dgoals=deploy
It will also deploy the released version before switching to the next snapshot.
mvn release:prepare release:perform -Dall -Dgoals=deploy -DdevelopmentVersion=1.6-SNAPSHOT -DreleaseVersion=1.5.5 -Dtag=v1.5.5