Skip to content

Latest commit

 

History

History
70 lines (48 loc) · 2.86 KB

v3-225-aave-v3-Ethereum-prime-core-removal-USDS-from-sUSDe-emode.md

File metadata and controls

70 lines (48 loc) · 2.86 KB

Proposal 225. Remove USDS from sUSDe Liquid E-Mode

Voting Link

Link to voting page

Governance Forum Discussion

Link to forum discussion

Payloads

Certora Analysis

Proposal Types

  • 🔧 📊 Configuration updates

Context

This proposal recommends the removal of USDS from the sUSDe Liquid E-Mode in the Aave Prime instance.

Proposal Creation

Transaction: 0xe108608cf4aedf0d16e951a55c9c8e07f1f39667d3cf7c560c6723840c2e7a91

  • proposalId: 225
  • creator: 0x57ab7ee15cE5ECacB1aB84EE42D5A9d0d8112922
  • accessLevel: 1
  • ipfsHash: 0x63789665d092c33439ca04f323667f770156b3a16123712bb63982c2912f8fa9

createProposal() Parameters

{
    "payloads": [
        {
            "chain": "1",
            "accessLevel": 1,
            "payloadsController": "0xdAbad81aF85554E9ae636395611C58F7eC1aAEc5",
            "payloadId": 228
        }
    ],
    "votingPortal": "0x9b24C168d6A76b5459B1d47071a54962a4df36c3",
    "ipfsHash": "0x63789665d092c33439ca04f323667f770156b3a16123712bb63982c2912f8fa9"
}

Aave Seatbelt Report

Proposal Report

Link to Seatbelt proposal report

Payload Reports

Technical Analysis

The technical adjustments outlined in the proposal have been successfully implemented. USDS has been correctly removed from the sUSDe Liquid E-Mode on the Aave Prime instance, and the liquidation bonus has been updated to 4% on both the Core and Prime instances. Verification confirms proper parameter updates and alignment with the protocol’s risk management framework.

The proposal is consistent with the description on both Snapshot and the governance forum.

Certora validations

  • ✅ The code on the proposal payload corresponds to the proposal specification.
  • ✅ The proposal includes a proper tests suite, checking all necessary post-conditions.
  • ✅ BGD reviewed the payload before the proposal was submitted.
  • ✅ Certora reviewed the procedure followed to submit the proposal.