You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
A model to post-hoc apply aggregate model losses (wake, electrical, etc.) would be ideal to better translate between the power production model and what is typically seen in operational analyses.
The text was updated successfully, but these errors were encountered:
A model to post-hoc apply aggregate model losses (wake, electrical, etc.) would be ideal to better translate between the power production model and what is typically seen in operational analyses.
The text was updated successfully, but these errors were encountered: