You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Currently it takes ~30min for each commit to an opened PR, which is quite large.
Especially, sync dependencies phase takes 15m 38s, as the test pipeline builds everything from the scratch, including depot_tools and fetching chromium (gclient sync).
We need to find a way to remove this phase with a docker image that contains depot_tools and chromium.
The text was updated successfully, but these errors were encountered:
Currently it takes ~30min for each commit to an opened PR, which is quite large.
Especially, sync dependencies phase takes 15m 38s, as the test pipeline builds everything from the scratch, including depot_tools and fetching chromium (
gclient sync
).We need to find a way to remove this phase with a docker image that contains depot_tools and chromium.
The text was updated successfully, but these errors were encountered: