You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
At the step "pondération", the output is in INT value, which I think a bit problematic.
In many cases, I suppose that the same landuse costs 20% more due to an other layer.
So I have my landuse with a value of 3 and the pondération layer with 1.2, and I do a multiplication.
So if the output is in INT, it rounds all the values.
Most of the time, I have to use "raster calculator" to do the pondération process.
The text was updated successfully, but these errors were encountered:
At the step "pondération", the output is in INT value, which I think a bit problematic.
In many cases, I suppose that the same landuse costs 20% more due to an other layer.
So I have my landuse with a value of 3 and the pondération layer with 1.2, and I do a multiplication.
So if the output is in INT, it rounds all the values.
Most of the time, I have to use "raster calculator" to do the pondération process.
The text was updated successfully, but these errors were encountered: