-
Notifications
You must be signed in to change notification settings - Fork 11
plan_reh_result_arc
Edgar Fuste edited this page Nov 2, 2021
·
1 revision
Table result and budget of rehabilitation planification of an arc.
Column name | Data type | Description |
---|---|---|
result_id | integer | Id of the result, defined on plan_result_cat |
arc_id | character varying(16) | Id of arc |
node_1 | character varying(16) | Id of arc's initial node |
node_2 | character varying(16) | Id of arc's final node |
arc_type | character varying(18) | Type of arc |
arccat_id | character varying(30) | Id of arc catalog |
sector_id | integer | Id of a hydraulic sector |
state | smallint | Main state of element |
expl_id | integer | Id of an exploitation |
parameter_id | character varying(30) | Repair that needs to be performed to correct the pathology |
work_id | character varying(30) | Id of a work associated |
init_condition | double precision | Circumferential location (Start measured clockwise) |
end_condition | double precision | Circumferential location (End measured clockwise) |
loc_condition | text | Pathology location |
pcompost_id | character varying(16) | Price of arc, defined on plan_price |
cost | double precision | Sum of all costs associated with the arc for each unit of measurement |
ymax | double precision | Pipe depth at which the work is conducted |
length | double precision | Length of arc |
measurement | double precision | Reparation measures |
budget | double precision | Total price of the arc. Multiply the arc_cost by its length |
the_geom | geometry(LineString,SRID) | Line geometry of element |